Well if you replace the walking stick with an excavator that is that song kind of holds true....
We are still rolling on with the build and thankfully the weather has held off for all the things that the builders needed dry weather for. We had a hick up that has been sorted now and thankfully with only a bit of a delay we can carry on with things as per plan. Joe and crew have dug the footings and poured them last week. This week they have blocked on top of the footings and poured the concrete in them too. Now the bobcat has come back and filled in the center of the footings with dirt and the fine gravel stuff to the top of the blocks. While that happened Kerrin and Joe checked all the levels for where the floor will be poured inside where they have boxed up for the foundations to be poured next week!
So all things going well we will be having a wee drinkie on the slab over Easter weekend!! So the plumbers will be in on Tuesday to do the drains etc then fingers crossed and doing all the anti rain dances I can the floor will get poured on Wednesday.
No comments:
Post a Comment